Two more sessions, and still on schedule. By the way I think I won't need to buy a laser level, since I can just check the slope of rows using a hose and water.
After second day |
Each digging session is 1-2 hours of intense work and then I have to give up for the day because my arms have gone all numb. During one such session I will have dug the distance between two pins that I have marked the row with, that is almost 1.5 meters.
After 3rd day |
So I guess I will have finished digging in 15 more sessions/days.
By the way, when I dig I put the topmost soil to the right, and the clay/bottom stuff to the left. Later when I backfill on top of the logs, I will only use the left stuff.